Skip to main content
NewsBanner

Ithra Dubai Marks Another Milestone with The Link Now Lifted to its Final Position 100 Meters Above Ground Level

Ithra Dubai Marks Another Milestone with The Link Now Lifted to its Final Position 100 Meters Above Ground Level

A new milestone was marked with the lift of the 192-meter long first section of the Link, it is now connecting the two towers of the iconic One Za’abeel 100 meters above ground level.

The Link Lift was carried out over 12 days and it is one of the heaviest lifts in the region, weighing in at around 8,500 tons. The first section of the Link is now in its final position.

The Link structure to reach its final length of 226 meters and that will top the list of engineering marvels and set to break an international record for the longest cantilevered building in the world.


SHARE NOW

Most Recent News


GDMO2 P01230826jpg
Dubai Municipality opens new bridge at Mushrif National Park
GDMO1- P04-23-08-26
Mada Media tops AED1.5bn in H1 2026 contracts, reinforcing Dubai’s out-of-home advertising
Screenshot 20260812 at 94755AM
DPC announces leading national institutions as partners for Arab Media Summit 2026

Mobile For an optimal experience please
rotate your device to portrait mode